• Motorcycle Inner Tube Extruding and Cooling Line / Inner Tube Cooling Line Batch off Cooler
  • Motorcycle Inner Tube Extruding and Cooling Line / Inner Tube Cooling Line Batch off Cooler
  • Motorcycle Inner Tube Extruding and Cooling Line / Inner Tube Cooling Line Batch off Cooler
  • Motorcycle Inner Tube Extruding and Cooling Line / Inner Tube Cooling Line Batch off Cooler

Motorcycle Inner Tube Extruding and Cooling Line / Inner Tube Cooling Line Batch off Cooler

After-sales Service: Life Long
Warranty: 2 Yeas
Certification: CE, ISO
Condition: New
Customized: Customized
Automatic Grade: Automatic
Customization:
Diamond Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
XPGL-750
Structure
Horizontal
Name
Inner Tube Cooling Line Batch off Cooler
Customize
We Could Customize According to Your Requirements
Color
as Customers′ Requirements
Voltage
380V or as Customers′ Requirements
Certificate
ISO9001,BV,CE
Delivery Time
Within 30 Working Days After Receiving The Deposit
Transport Package
Standard Export Packing
Specification
Motor total power: 12.4kw
Trademark
BORIA
Origin
Qingdao, China
HS Code
8477800000
Production Capacity
50 Sets Per Month

Product Description

Inner Tube Cooling Line Batch Off Cooler
Motorcycle Inner Tube Extruding and Cooling Line / Inner Tube Cooling Line Batch off CoolerMotorcycle Inner Tube Extruding and Cooling Line / Inner Tube Cooling Line Batch off Cooler
I. Introduction
· The inner tube tread cooling and cutting linkage device is suitable for cooling and fixed-length cutting of the inner tube tread.
· Automatic butyl inner tube extrusion and cooling linkage line, main functions, automatic digging, automatic installation of fitting nozzles, automatic fixed-length cutting, etc.

II. Technical parameter
 Length of cold water tank 14m
Linear speed 10-40m/min (inverter stepless speed change)
Punch diameter  7-8mm
Air pressure 0.6-0.7Mpa
Main motor power 3.7kw
Blower 2.2kw*4sets
Powder spraying machine (internal) 0.37kw
Linkage line height 830mm
Total length of linkage line 26meters

III. Picture for Reference
Motorcycle Inner Tube Extruding and Cooling Line / Inner Tube Cooling Line Batch off CoolerMotorcycle Inner Tube Extruding and Cooling Line / Inner Tube Cooling Line Batch off CoolerMotorcycle Inner Tube Extruding and Cooling Line / Inner Tube Cooling Line Batch off CoolerMotorcycle Inner Tube Extruding and Cooling Line / Inner Tube Cooling Line Batch off Cooler
IV. Our Services
1. Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.
2. In the process of production, we will take photos and send to customers for their track the progress.
3. Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
4. We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
5. We supply overseas engineer service and help to train your workers to operate the machine.
Motorcycle Inner Tube Extruding and Cooling Line / Inner Tube Cooling Line Batch off CoolerMotorcycle Inner Tube Extruding and Cooling Line / Inner Tube Cooling Line Batch off CoolerMotorcycle Inner Tube Extruding and Cooling Line / Inner Tube Cooling Line Batch off Cooler
V. FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
 From engineer designing to production completion, it needs about 25 to 35 days.
 
2. What does your factory do regarding quality control?
 We pay much more importance to quality control from the very beginning to the end of production.
 Every machine will be fully assembled and carefully tested before shipment.
 
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
 
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
 Small machine usually takes within 2~3 days.
 Big plant usually takes about 30 days.
 
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
 
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now