rubber sheet cooling machine,cooler for rubber
I. Introduction
1. The batch off unit take off adopts steel conveying rollers, equipped with printer and slitter. The take-off and lifting device are driven by a common AC inverter motor. The conveying speed ID adjustable.
2. The sheet is uniformly coated with the lubricator by dipping without polluting the environment. Its cooling effect is better than the spraying.
3. The hanging up area is fully closed, which adopts the blower to blow the sheet at a slant. So it improves the air flowing direction and cooling effect.
4. The electric control system adopts a reliable and automatic PC
II. Notes
1. The batch off unit can be designed according to the customers' requirements. There's hanging rod type,mesh belt type,drum type and overhead type.
2. The batch off unit is a conbined construction. Customer can add or reduce the middle support as required.
3. Customer can select the transverse strip cutter and the strip slitter according to the processing requirements.
III. Technical parameter of XGPL-600
Item |
XGPL-600~700 |
XGPL-800~1000 |
Suitable rubber sheet size |
(4-12)x600~700 |
(4-12)x800~1000 |
Max. line speed of front access conveyor belt |
31m/min |
36m/min |
Max. line speed of hanging rod |
0.7-4.2m/min |
0.6-4.2m/min |
Axial fan |
0.37kw 5760m³/min |
0.37kw 5760m³/min |
Swing rubber range and frequency |
1.2m 10-16times/min |
1.2m 10-16times/min |
Rubber sheet temperature after cooling |
≤ room temperature +5ºC |
≤ room temperature +5ºC |
Speed adjustment control method |
Inverter control |
Inverter control |
IV. Picture For Reference
1) Hanging rod type - mainly used for cooling rubber sheet with 4-12mm thickness
2) Mesh belt type - mainly used for cooling rubber sheet with 1-8mm thickness
3) Cooling drum type - mainly used for cooling rubber sheet with 1-6mm thickness
V. Machines' Working Pictures in Our Customers' Plant for Your Reference
VI. Test Running Before Delivery
Before leaving factory, this rubber sheet cooling machine needs to pass 24 hours' test running and guarantee no oil leakage and seeping to avoid unnecessary quality problems.
VII. Packaging
Equipment painting completed before delivery, and then wrapped with stretch film, to protect the painting surface, we use wooden packaging outside.The key parts of the machine, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.
VI. FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.