U-Seal,V-Seal Moulding Press China Manufacturer/O-Rings and Sealed Washer Rubber Moulding PressUsage
Mainly used in the vulcanization of rubber products: seals, shock absorption pads, shoe soles, seals, floor tiles powder, auto parts, machinery and equipment with rubber parts and other pieces of rubber; the materials comprising: silicone rubber, fluorine rubber, natural rubber, regenerated synthetic rubber, rubber powder.
Product Introduction
1,Cylinder, piston cast iron with high wear resistance through QT Grinding finished form, and by the line of high-pressure hydraulic resistance against permeation experiments, preventing the cylinder, piston oil leakage caused by defects in the machine.
2,Hot plate with 45 high-quality steel finishing, two hot plate surface subjected to surface grinding to ensure two parallel surfaces of the hot plate, the maximum extent to ensure uniform thickness of the product.
3, pressure-resistant insulation boards ≥400kg / cm2, a thermal conductivity of 0.18Kcal / m ºC temperature at 220 ºC -250 ºC, the thickness of the insulating material for the new 20mm to address the use of rubber asbestos partial compression, separated poor heating effect.
Technical parameters and corresponding price
Type XLB200T-B Automatic
Nominal clamping-oil pressure 2000KN
Max working-oil pressure 16
Hot plate size 500*500
Hot plate space 200
Max plunger stroke 200
Working layers 1
Heating way Electric heating
Hot plate pressure per unit area 8
The motor power (kw) 5.5
Operation method PLC automatic control
Parameter setting mode Sub-parameter input touchscreen
Dimensions 1170*1950*2230
Weight 3200
Remarks POST PALLET
FAQ:
1.Q:Are you a factory or trading company?
A:We are a professional manufacturer and running our own factory for more than 10 years .
2.Q:Where is your factory?How can I visit ?
A:Our factory located in qingdao city.You can fly to QINGDAO LIUTING airport,then we can pick you up to our factory for your visiting.We are looking forward to your visiting.
3.Q:How does your factory control the quality of machines and after sales service?
A:Our machines have passed CE,ISO,SGS certification,with best quality and reasonable price.All our machines have 1 year guarantee, will be provided for a lifetime maintenance.
4.What's your payment term?
A:Common is 30% deposit by T/T,the balance paid against shipping documents
Or L/C at sight.
5.Q:Can you design new product for us?
A:we have a professional development team that can make new products according to your requirements.
6. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.
7. What does your factory do regarding quality control?
We pay much more attention to the quality controlling from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.
8. What's the machine quality guarantee?
we provide one year warrenty for our machines.We choose the world's famous brand of components to keep our machine in perfect working condition.
9. Are you able to provide the installation and commissioning of machines overseas? How long will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
10. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
Packaging
Equipment painting completed before delivery, and then wrapped with stretch film, to protect the painting surface, we use wooden packaging outside.The key parts of the machine, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.
There are 15 experienced engineers and 108 skilled workers in our company, guaranteeing delivery on time as stipulated in the contract. At the same time, the company established a long-term cooperative relation with Cosco, for ensuring the goods arriving port on time.
Our Services
Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.
In the process of production, we will take photos and send to customers for their track the progress.
Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
We supply overseas engineer service and do our best to teach your workers operate the machine themselves.