1.Product Profile:
Rubber Tension Conveying Green Belt Forming Machine with BV ISO SGS
Tension Conveying Green Belt Building Machine production line is mainly used in nylon belt, EP belt, layered cotton canvas belt building and conveying belt rubberzing. The production line in the building process, The blank in the control of magnetic powder brake, then tension state assembly, the cloth guilding and coiling the wrinkle device ensures the cloth not wrinkle, building operation on both sides of the back and forth; material car can manually adjust the width direction of the position;in the tensioning roller device of the nearby set up an emergency stop button. The rotation speed manual control. All the electrical configuration on the same side, cloth coiling roller can be separated form, the production line can be two round-trip lamination, tensioning roller in middle position of whole line.
2.Technical parameter
1. Maximum width of rubber sheet: 1000mm
2. Rubber thickness: 3-30 mm
3.Forming speed: 5-20 meter/minute(Continuously adjustable)
4. Maximum number of layers in one time: 4 layer
5. Cushion cloth maximum diameter: 1000 mm
6. The maximum diameter of the greige roll 3000 mm
7. Working type: Reciprocating
8.Distance from workplace to ground : 820 mm
9. The total size of the equipment installation: About 32meter (By the user according to the actual situation of the scene)
Each parts quantity of the whole line
No. |
Name |
In which part |
unit |
quantity |
Note |
1 |
Coiling device |
Machine part |
suit |
2 |
|
Motor, pinch reducer, magnetic powder tension device |
suit |
2 |
|
2 |
Fit traction device |
Machine part |
suit |
2 |
Install safety rope switch |
Motor, pinch reducer |
set |
2 |
|
3 |
Hanging material rack (single and double) |
Machine part |
suit |
4 |
The hanging truck is manually moved |
4 |
Working table |
|
suit |
1 |
|
5 |
Side pressure |
|
suit |
1 |
|
6 |
Brush device |
|
suit |
1 |
|
7 |
Trimming fixed-width device |
|
suit |
1 |
|
8 |
Full line electric |
|
suit |
1 |
With the main control box to the motor cable |
3. Our machine list
Our company professional manufacture rubber vulcanizing press (frame type,four column type,lab press and so on), rubber mixing mill, batch off cooler, rubber extruder, rubber strip making machine and tire recycling equipment.
4. Our service
1. Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.
2. In the process of production, we will take photos and send to customers for their track the progress.
3. Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
4. We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
5. We supply overseas engineer service and help to train your workers to operate the machine.
6. Test running: The above machines are all passed inspection of 3~5 hours of full load operation before leaving our factory. And we will take the video and send it to you for inspection. You can use it directly thus saving the time of test-run and expense. And we also warmly welcome to our factory to inspect and test running.
7.Warranty: 12 months after installation, if our machines have any problems, please feel free to contact me. We will solve it for you as soon as possible, and give you the best services.
FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.
If you interested in our products mentioned above, kindly let us know by return email. Then I will supply you with further information. Meanwhile, welcome to visit our factory!