2021 Rubber Sheet Batch off Cooler Batch off Cooling Machine for Cooling Rubber Sheet

Product Details
Customization: Available
Warranty: 1 Year
Control Type: PLC
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
16
Year of Establishment
2016-12-15
  • 2021 Rubber Sheet Batch off Cooler Batch off Cooling Machine for Cooling Rubber Sheet
  • 2021 Rubber Sheet Batch off Cooler Batch off Cooling Machine for Cooling Rubber Sheet
  • 2021 Rubber Sheet Batch off Cooler Batch off Cooling Machine for Cooling Rubber Sheet
  • 2021 Rubber Sheet Batch off Cooler Batch off Cooling Machine for Cooling Rubber Sheet
  • 2021 Rubber Sheet Batch off Cooler Batch off Cooling Machine for Cooling Rubber Sheet
  • 2021 Rubber Sheet Batch off Cooler Batch off Cooling Machine for Cooling Rubber Sheet
Find Similar Products

Basic Info.

Automatic Grade
Automatic
Power Source
Electric
Type
Batch off Cooler
Name
Rubber Sheet Cooling Machine,Batch off Cooler
Condition
New
Color
as Your Requirements
Delivery Time
Within 30 Working Days After Receiving The Deposit
Transport Package
Standard Export Packing
Specification
Motor total power: 12.4kw
Trademark
BOJIA
Origin
Qingdao, China
HS Code
8477800000
Production Capacity
50 Sets Per Month

Product Description

rubber sheet cooling machine,batch off cooler
I. Introduction
1. The batch off unit take off adopts steel conveying rollers, equipped with printer and slitter. The take-off and lifting device are driven by a common AC inverter motor. The conveying speed ID adjustable.
2. The sheet is uniformly coated with the lubricator by dipping without polluting the environment. Its cooling effect is better than the spraying.

3. The hanging up area is fully closed, which adopts the blower to blow the sheet at a slant. So it improves the air flowing direction and cooling effect.
4. The electric control system adopts a reliable and automatic PC


II. Technical parameter of XGPL-600
Adapted Max. Rubber Sheet Width 600mm
Rubber Sheet Thickness 4-12mm
Max. Hanging Rubber Sheet Length Hanging in Rod 1400mm
Power Supply 415V / 60HZ
Sheet Access Conveyor Belts Max. Linear Speed 10-36m / min
Hanging rod maximum moving speed 2.6m / min
Swing rubber speed 10-20 times / min
Axial Flow Cooling Fan Power 0.55kw
Axial Flow Cooling Fan Number 12 sets
The rubber sheet's storage volume in the air bellow 100meters (the rubber sheet could stay in the air bellow for about 50-65 minutes if one set rubber mixing mill is working)
Motor total power 12.4kw
Cooling temperature Room temperature +5ºC
Total Length of Whole Machine About 7.2meters (including the length of the swing rubber tray)

III. Picture show
2021 Rubber Sheet Batch off Cooler Batch off Cooling Machine for Cooling Rubber Sheet
2021 Rubber Sheet Batch off Cooler Batch off Cooling Machine for Cooling Rubber Sheet2021 Rubber Sheet Batch off Cooler Batch off Cooling Machine for Cooling Rubber Sheet2021 Rubber Sheet Batch off Cooler Batch off Cooling Machine for Cooling Rubber Sheet2021 Rubber Sheet Batch off Cooler Batch off Cooling Machine for Cooling Rubber Sheet

Packaging
 
Equipment painting completed before delivery, and then wrapped with stretch film, avoid rubbing the paint off the surface, wooden packaging can be customized, key parts, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.
 
FAQ
 
1. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production. Every machine will be fully assembled and carefully tested before shipment.
 
2. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
 
3. Are you able to give installation and commissioning overseas?How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation. Small machine usually takes within 2~3 days. Big production line usually takes about 30 days.
 
4. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order. The core of our company culture is innovation,quality,integrity and efficiency. Also we have had many good cooperation with world famous rubber production manufacturers. 
 
If you come to our factory, we can show the user around us.
 
5. How can we go to your side?
 
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao liuting airport. We will pick up you at the airport.
 
Our Services
 
 Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.
 
 In the process of production, we will take photos and send to customers for their track the progress.
 
 Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
 
 We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
 
 We supply overseas engineer service and help to train your workers to operate the machine.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier