Lab Rubber Molding Press Machine, Laboratory Vulcanizing Press Machine

Product Details
Customization: Available
Warranty: 1 Year
Control Type: PLC
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
16
Year of Establishment
2016-12-15
  • Lab Rubber Molding Press Machine, Laboratory Vulcanizing Press Machine
  • Lab Rubber Molding Press Machine, Laboratory Vulcanizing Press Machine
  • Lab Rubber Molding Press Machine, Laboratory Vulcanizing Press Machine
Find Similar Products

Basic Info.

Model NO.
XLB-350
Automatic Grade
Automatic
Power Source
Electric
Type
Rubber Vulcanizing Press
Name
Rubber Vulcanizing Press
Condition
New
Color
as Customers′ Requirements
Motor Power
2.2kw
Working Layers
1,2,4,as Customers′ Requirements
Outline Dimension
570*1450*350
Delivery Time
Within 30 Working Days After Receiving The Deposit
Payment Terms
T/T;L/C
Transport Package
Standard Export Packing
Specification
weight: about 1000kgs
Trademark
BOJIA
Origin
Qingdao, China
HS Code
8477800000
Production Capacity
50 Sets Per Month

Product Description

   Lab Rubber Molding Press Machine, Laboratory Vulcanizing Press Machine

I. Our service

1. Test running: The above machines are all passed inspection of 3~5 hours of full load operation before leaving our factory. And we will take the video and send it to you for inspection. You can use it directly thus saving the time of test-run and expense. And we also warmly welcome to our factory to inspect and test running.
2.Warranty: 12 months after installation, if our machines have any problems, please feel free to contact me. We will solve it for you as soon as possible, and give you the best services.


II. Main Features
1. Being a column structure and downward pressing type, the heating plate opens by the self-weight of the heating plate, platform and plunger. The rising of the plunger makes the heating plate close while the hydraulic oil provides the pressure.

2. The engine base is combined together with the cylinder and base frame, which is made of ductile iron to increase the cylinder intensity and a brad ability. The cylinder is fitted with the sealing washer made of the oil-resisting rubber for the sealing purpose.

3. By moving the operational handle of the control valve to the two different positions, the heating plate can open and close.

4. It uses the electric pipe for heating, thus makes the workshop clean with easy and reliable operation.


III. Technical parameter
Model 25T
Nominal clamping mould force (KN) 250
Max working oil pressure 16
Hot plate size (mm) 350*350
Hot plate space (mm) 125
Working layers 2
Plunger stroke 250
Heating mode Steam/electric heating
Hot plate pressure per unit area 2.04
Motor power (KW) 2.2
Overall dimension (mm) 570*1450*350
Weight (KG) 1000

IV. Picture show
Lab Rubber Molding Press Machine, Laboratory Vulcanizing Press Machine
Lab Rubber Molding Press Machine, Laboratory Vulcanizing Press Machine
Lab Rubber Molding Press Machine, Laboratory Vulcanizing Press Machine
Lab Rubber Molding Press Machine, Laboratory Vulcanizing Press Machine
Lab Rubber Molding Press Machine, Laboratory Vulcanizing Press Machine
Lab Rubber Molding Press Machine, Laboratory Vulcanizing Press Machine

V. Our machine list
Our company professional manufacture rubber vulcanizing press (frame type,four column type,lab press and so on), rubber mixing mill, batch off cooler, rubber extruder, rubber strip making machine and tire recycling equipment.

FAQ
 
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
 From engineer designing to production completion, it needs about 25 to 35 days.
 
2. What does your factory do regarding quality control?
 We pay much more importance to quality control from the very beginning to the end of production.
 Every machine will be fully assembled and carefully tested before shipment.
 
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
 
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
 Small machine usually takes within 2~3 days.
 Big plant usually takes about 30 days.
 
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
 
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier