Product Description
Rubber Sheet Cooling Machine (Batch Off) Xpg-800~1000
1. The batch cooler is used for cooling, folding and depositing the rubber strip that comes from the open mills or twin screw extruder.
2. Structure characteristics: There are two structures types: Overhead and floor-standing types.
3. The clients can choose high or low disposition according to the practical requirments.
4. The high disposition batch-off line has hydraulic auto wig wag section, which can battle the rubber strip tidily, the strip tidy ratio (< =100mm);
5. There are three working positions for auto entering and outputting of material tray.
6. Auto rubber collecting device; Auto cutter device; It has high automatization and can realize unattended operation
/ Main parameters / model |
XPG-600~700 |
XPG-800~1000 |
Applicable rubber sheet size |
(4-12)x600~700 |
(4-12)x800~1000 |
Max. line speed of front access conveyor belt |
31m/min |
36m/min |
Max. line speed of hanging rod |
0.7-4.2m/min |
0.6-4.2m/min |
Axial fan |
0.37kw 5760m3/m |
0.37kw 5760m3/m |
Swing rubber range and frequency |
1.2m 10-16times/min |
1.2m 10-16times/min |
Rubber sheet temperature after cooling |
≤ Greenhouse + 5°C |
≤ Greenhouse + 5°C |
Speed adjustment control method |
Inverter control |
Inverter control |
Hanging rod space |
160 or 101.6 |
160 or 101.6 |
: Three kinds of rubber sheet cooling machine: (4-12mm)Hanging rod type (used for 4-12mm thickness rubber sheet) (1-8mm) Mesh belt type (used for 1-8mm thickness rubber sheet) (1-6mm) Drum type (used for 1-6mm thickness rubber sheet) |
If you interested in our products mentioned above, kindly let us know by return email. Then I will supply you with further information. Meanwhile, welcome to visit our factory!
Our Services
Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.
In the process of production, we will take photos and send to customers for their track the progress.
Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
We supply overseas engineer service and help to train your workers to operate the machine.
FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.
Packaging
Equipment painting completed before delivery, and then wrapped with stretch film, avoid rubbing the paint off the surface, wooden packaging can be customized, key parts, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.
There are 15 experienced engineers and 108 skilled workers in our company, guaranteeing delivery on time as stipulated in the contract. At the same time, the company established a long-term cooperative relation with Cosco, for ensuring the goods arriving port on time.