Batch-off Unit / Rubber Compound Sheet Cooling Machine / Water System Batch off Cooler Line

Product Details
Customization: Available
After-sales Service: Life Long
Warranty: 2 Years
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
16
Year of Establishment
2016-12-15
  • Batch-off Unit / Rubber Compound Sheet Cooling Machine / Water System Batch off Cooler Line
  • Batch-off Unit / Rubber Compound Sheet Cooling Machine / Water System Batch off Cooler Line
  • Batch-off Unit / Rubber Compound Sheet Cooling Machine / Water System Batch off Cooler Line
  • Batch-off Unit / Rubber Compound Sheet Cooling Machine / Water System Batch off Cooler Line
  • Batch-off Unit / Rubber Compound Sheet Cooling Machine / Water System Batch off Cooler Line
  • Batch-off Unit / Rubber Compound Sheet Cooling Machine / Water System Batch off Cooler Line
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • FAQ
Overview

Basic Info.

Model NO.
XGPL-700
Control Type
PLC
Automatic Grade
Automatic
Power Source
Electric
Type
Hanging Rod Type Rubber Sheet Cooling Machine
Name
Rubber Sheet Cooling Machine Batch off Cooler
Condition
New
Customize
We Could Customize According to Your Requirements
Color
as Customers′ Requirements
Voltage
380V or as Customers′ Requirements
Certificate
ISO9001,BV,CE
Delivery Time
Within 30 Working Days After Receiving The Deposit
Transport Package
Standard Export Packing
Specification
Motor total power: 12.4kw
Trademark
BORIA
Origin
Qingdao, China
HS Code
8477800000
Production Capacity
50 Sets Per Month

Packaging & Delivery

Package Size
100.00cm * 100.00cm * 100.00cm
Package Gross Weight
5000.000kg

Product Description

batch-off unit / rubber cooling machine
Product Description

I. Introduction
1. The batch off unit take off adopts steel conveying rollers, equipped with printer and slitter. The take-off and lifting device are driven by a common AC inverter motor. The conveying speed ID adjustable.
2. The sheet is uniformly coated with the lubricator by dipping without polluting the environment. Its cooling effect is better than the spraying.
3. The hanging up area is fully closed, which adopts the blower to blow the sheet at a slant. So it improves the air flowing direction and cooling effect.
4. The electric control system adopts a reliable and automatic PC

II. Notes
1. The batch off unit can be designed according to the customers' requirements. There's hanging rod type,mesh belt type,drum type and overhead type.
2. The batch off unit is a conbined construction. Customer can add or reduce the middle support as required.
3. Customer can select the transverse strip cutter and the strip slitter according to the processing requirements.
Product Parameters

III. Technical parameter of XGPL-600
Adapted Max. Rubber Sheet Width 600mm
Rubber Sheet Thickness 4-12mm
Max. Hanging Rubber Sheet Length Hanging in Rod 1400mm
Power Supply 415V / 60HZ
Sheet Access Conveyor Belts Max. Linear Speed 10-36m / min
Hanging rod maximum moving speed 2.6m / min
Swing rubber speed 10-20 times / min
Axial Flow Cooling Fan Power 0.55kw
Axial Flow Cooling Fan Number 12 sets
The rubber sheet's storage volume in the air bellow 100meters (the rubber sheet could stay in the air bellow for about 50-65 minutes if one set rubber mixing mill is working)
Motor total power 12.4kw
Cooling temperature Room temperature +5ºC
Total Length of Whole Machine About 7.2meters (including the length of the swing rubber tray)
Detailed Photos

Batch-off Unit / Rubber Compound Sheet Cooling Machine / Water System Batch off Cooler LineBatch-off Unit / Rubber Compound Sheet Cooling Machine / Water System Batch off Cooler LineBatch-off Unit / Rubber Compound Sheet Cooling Machine / Water System Batch off Cooler LineBatch-off Unit / Rubber Compound Sheet Cooling Machine / Water System Batch off Cooler LineBatch-off Unit / Rubber Compound Sheet Cooling Machine / Water System Batch off Cooler LineBatch-off Unit / Rubber Compound Sheet Cooling Machine / Water System Batch off Cooler LineBatch-off Unit / Rubber Compound Sheet Cooling Machine / Water System Batch off Cooler LineBatch-off Unit / Rubber Compound Sheet Cooling Machine / Water System Batch off Cooler Line

IV. Our Services
1. Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.
2. In the process of production, we will take photos and send to customers for their track the progress.
3. Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
4. We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
5. We supply overseas engineer service and help to train your workers to operate the machine.
FAQ

V. FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
 From engineer designing to production completion, it needs about 25 to 35 days.
 
2. What does your factory do regarding quality control?
 We pay much more importance to quality control from the very beginning to the end of production.
 Every machine will be fully assembled and carefully tested before shipment.
 
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
 
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
 Small machine usually takes within 2~3 days.
 Big plant usually takes about 30 days.
 
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
 
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Jiaodong International airport.
We will pick up you at the airport.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
People who viewed this also viewed