batch-off unit / rubber cooling machine
Product Description
I. Introduction
1. The batch off unit take off adopts steel conveying rollers, equipped with printer and slitter. The take-off and lifting device are driven by a common AC inverter motor. The conveying speed ID adjustable.
2. The sheet is uniformly coated with the lubricator by dipping without polluting the environment. Its cooling effect is better than the spraying.
3. The hanging up area is fully closed, which adopts the blower to blow the sheet at a slant. So it improves the air flowing direction and cooling effect.
4. The electric control system adopts a reliable and automatic PC
II. Notes
1. The batch off unit can be designed according to the customers' requirements. There's hanging rod type,mesh belt type,drum type and overhead type.
2. The batch off unit is a conbined construction. Customer can add or reduce the middle support as required.
3. Customer can select the transverse strip cutter and the strip slitter according to the processing requirements.
Product Parameters
III. Technical parameter of XGPL-600
Adapted Max. Rubber Sheet Width |
600mm |
Rubber Sheet Thickness |
4-12mm |
Max. Hanging Rubber Sheet Length Hanging in Rod |
1400mm |
Power Supply |
415V / 60HZ |
Sheet Access Conveyor Belts Max. Linear Speed |
10-36m / min |
Hanging rod maximum moving speed |
2.6m / min |
Swing rubber speed |
10-20 times / min |
Axial Flow Cooling Fan Power |
0.55kw |
Axial Flow Cooling Fan Number |
12 sets |
The rubber sheet's storage volume in the air bellow |
100meters (the rubber sheet could stay in the air bellow for about 50-65 minutes if one set rubber mixing mill is working) |
Motor total power |
12.4kw |
Cooling temperature |
Room temperature +5ºC |
Total Length of Whole Machine |
About 7.2meters (including the length of the swing rubber tray) |
Detailed Photos
IV. Our Services
1. Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.
2. In the process of production, we will take photos and send to customers for their track the progress.
3. Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
4. We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
5. We supply overseas engineer service and help to train your workers to operate the machine.
FAQ
V. FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Jiaodong International airport.
We will pick up you at the airport.