batch-off cooling machine,rubber sheet cooler
I. Introduction
1. The batch off unit take off adopts steel conveying rollers, equipped with printer and slitter. The take-off and lifting device are driven by a common AC inverter motor. The conveying speed ID adjustable.
2. The sheet is uniformly coated with the lubricator by dipping without polluting the environment. Its cooling effect is better than the spraying.
3. The hanging up area is fully closed, which adopts the blower to blow the sheet at a slant. So it improves the air flowing direction and cooling effect.
4. The electric control system adopts a reliable and automatic PC
II. Notes
1. The batch off unit can be designed according to the customers' requirements. There's hanging rod type,mesh belt type,drum type and overhead type.
2. The batch off unit is a conbined construction. Customer can add or reduce the middle support as required.
3. Customer can select the transverse strip cutter and the strip slitter according to the processing requirements.
III. Technical parameter of XGPL-600
Item |
XGPL-600~700 |
XGPL-800~1000 |
Suitable rubber sheet size |
(4-12)x600~700 |
(4-12)x800~1000 |
Max. line speed of front access conveyor belt |
31m/min |
36m/min |
Max. line speed of hanging rod |
0.7-4.2m/min |
0.6-4.2m/min |
Axial fan |
0.37kw 5760m³/min |
0.37kw 5760m³/min |
Swing rubber range and frequency |
1.2m 10-16times/min |
1.2m 10-16times/min |
Rubber sheet temperature after cooling |
≤ room temperature +5ºC |
≤ room temperature +5ºC |
Speed adjustment control method |
Inverter control |
Inverter control |
IV. Picture For Reference
1) Hanging rod type - mainly used for cooling rubber sheet with 4-12mm thickness
2) Mesh belt type - mainly used for cooling rubber sheet with 1-8mm thickness
3) Cooling drum type - mainly used for cooling rubber sheet with 1-6mm thickness
V. Machines' Working Pictures in Our Customers' Plant for Your Reference
VI. Test Running Before Delivery
Before leaving factory, this rubber sheet cooling machine needs to pass 24 hours' test running and guarantee no oil leakage and seeping to avoid unnecessary quality problems.
VII. Packaging
Equipment painting completed before delivery, and then wrapped with stretch film, to protect the painting surface, we use wooden packaging outside.The key parts of the machine, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.
VIII. Our Services
1. Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.
2. In the process of production, we will take photos and send to customers for their track the progress.
3. Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
4. We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
5. We supply overseas engineer service and help to train your workers to operate the machine.