Lab Rubber Mixing Mill, Lab Open Mixing Mill
I. Feature
1. Roller adopt alloy chilled cast iron. Its surface is with high hardness and wearproof. Roller surface do mirror processing. Two rollers inner hollow spray type. Roller surface temperature uniformity.
2. Roller is ball bearing, grease lubrication structure.
3. Roller adopt device respectively adopt worm wheel, worm drive. It could optional install motorized nip adjustment,easy to operate.
4. This machine is whole base structure, convenient to install.
II. Technical parameter
Item |
XK-160 |
XK-250 |
XK-360 |
XK-400 |
XK-450 |
XK-550 |
XK-560 |
XK-660 |
XK-710 |
Roll diameter (mm) |
160 |
250 |
360 |
400 |
450 |
550 |
560-510 |
660 |
710 |
Roll working length |
320 |
620 |
900 |
1000 |
1200 |
1500 |
1530 |
2130 |
2200 |
Front roll linear speed (r/min) |
9 |
16.3 |
16.7 |
19.3 |
21.8 |
22.5 |
27.2 |
28 |
31.9 |
Speed ratio of rolls |
01: 01.4 |
01: 01.1 |
01: 01.3 |
01: 01.3 |
01: 01.3 |
01: 01.2 |
01: 01.2 |
01: 01.2 |
01: 01.5 |
Max roll space (mm) |
4.5 |
8 |
10 |
10 |
12 |
16 |
15 |
0.5-15 |
0.5-15 |
Compound feeding capacity(kg) |
1-2 |
10-15 |
20-25 |
18-35 |
50 |
50-65 |
50-65 |
165 |
190 |
Motor power(kw) |
5.5 |
18.5 |
30 |
45 |
55 |
110 |
90 |
240 |
280 |
Dimensions(L× W× H) |
|
|
|
|
|
|
|
|
|
L (mm) |
1133 |
2722 |
4200 |
4920 |
5405 |
6646 |
6270 |
7280 |
8185 |
W (mm) |
920 |
1115 |
1780 |
1780 |
1740 |
2736 |
2282 |
3400 |
3910 |
H (mm) |
1394 |
1345 |
1760 |
1800 |
1790 |
2105 |
2000 |
2530 |
2270 |
Gross weight (T) |
~2 |
~3.2 |
~6.5 |
~8 |
~11.4 |
~22 |
~22.5 |
~49 |
~51 |
III. Picture show
IV. Inspection and Test Running Before Delivery
Before leaving factory, this rubber vulcanizing machine needs to pass 24 hours' test running and guarantee no oil leakage and seeping to avoid unnecessary quality problems.
V. Packaging and Delivery
Equipment painting completed before delivery, and then wrapped with stretch film, to protect the painting surface, we use wooden packaging outside.The key parts of the machine, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.
VI. Our service
1. Test running: The above machines are all passed inspection of 3~5 hours of full load operation before leaving our factory. And we will take the video and send it to you for inspection. You can use it directly thus saving the time of test-run and expense. And we also warmly welcome to our factory to inspect and test running.
2.Warranty: 12 months after installation, if our machines have any problems, please feel free to contact me. We will solve it for you as soon as possible, and give you the best services.
If you interested in our products mentioned above. Kindly let us know by return email. Then I will supply you with further information. Meanwhile, welcome to visit our factory!